S&OP PROCESS – Demand Planning, S&OP/ IBP, Supply Planning, Business Forecasting Blog https://demand-planning.com S&OP/ IBP, Demand Planning, Supply Chain Planning, Business Forecasting Blog Sun, 30 Jun 2019 10:49:36 +0000 en hourly 1 https://wordpress.org/?v=6.6.4 https://demand-planning.com/wp-content/uploads/2014/12/cropped-logo-32x32.jpg S&OP PROCESS – Demand Planning, S&OP/ IBP, Supply Planning, Business Forecasting Blog https://demand-planning.com 32 32 What Is S&OP? https://demand-planning.com/2019/06/01/what-is-sop-and-how-does-it-work/ https://demand-planning.com/2019/06/01/what-is-sop-and-how-does-it-work/#comments Sat, 01 Jun 2019 13:15:34 +0000 https://demand-planning.com/?p=6116

A key element in sustaining a competitive advantage in today’s global business environment is an effective Sales & Operations Planning (S&OP) process. Supply-chain focused companies use S&OP to develop a business-wide game plan to improve its overall business performance. It is designed to enable value-based management and ensure optimal overall business results.

What is S&OP?

Sales & Operations Planning (S&OP) is the process by which we bring together all the plans for the business (Customers, Sales, Marketing, Development, Manufacturing, Sourcing, and Financial) into one integrated set of tactical plans. S&OP gives management the ability to direct its business to achieve a sustainable competitive advantage. The overall objective of S&OP is to arrive at a business “Game Plan” to help manage and allocate critical resources to meet the needs of the customer at the lowest cost. S&OP is a five-step process as illustrated in Figure 1.

Figure 1: The S&OP Process

 

What Is S&OP?

S&OP is a process that coordinates different areas of the business to meet customer demand with the appropriate level of supply.

Implementation of S&OP should be undertaken in phases. Most businesses start with a pilot program in one business unit in one country, for example. S&OP has been around for over 20 years now, and many firms have implemented it at the country or region level. However, in today’s globalized economy, firms must evolve to using S&OP at the global level.

The Global S&OP Process

 Globalization has occurred at such a rapid pace that many firms today find themselves thinking “globally” but acting “locally.” It is only natural that priority has been given to establishing a presence in new and emerging markets. However, it is time for firms to begin the journey to global planning and execution in supply chain.

The first step in implementing Global S&OP is to understand the configuration of the firm’s demand and supply planning, and execution processes. For example, do plants only serve their region and if so, is this the best approach? What region-specific product requirements exist? For example, do different packaging and labeling have to be used in each region? Global S&OP is applicable regardless of existing constraints within regions. However, it must be customized based on that situation. Obviously, one goal is to eliminate self-imposed constraints that make global planning more difficult.

This article will present details for two scenarios. In the first, most products can be produced at all plants globally. Products are assigned to plants based on profitability. In the second, most products are sold and produced at a regional level. Both scenarios can benefit from Global S&OP.

S&OP Scenario 1: Most Products Can Be Produced At All Plants Globally

 Let us assume a global business has five producing plants located on four different continents. All five plants can individually produce approximately 80% of the total products offered. The other 20% of the products must be produced at a particular plant. This constraint is programmed into the toolset used to optimize the production schedules. The S&OP process for this scenario is outlined in Figure 2 (see below).

In this environment, regional demand is consolidated to arrive at a figure for global demand. Then, demand is allocated to the producing plants based on projected gross margins. The overall objective of the Global S&OP process is to maximize operating results within the service level and inventory constraints. Highlights of the process include the following:

  • Demand planning is performed on a regional basis as regional marketing and sales are closest to their market and are held accountable for meeting the sales plan.
  • The regional demand plans are consolidated into a global demand plan, which is compared against the global business plan. Global marketing can and does make adjustments to the overall demand plan.
  • The Global Master Production Scheduler develops the supply plan and assigns products and volumes to individual plants using the optimizer tool. The results are shared with the regions.
  • A Global S&OP meeting is conducted to review and discuss the supply plan. Open issues or individual regional concerns are addressed in this meeting.
  • The Regional Master Production Schedulers develop more detailed plans for plants in their region. They are constrained by decisions made in the Executive S&OP meeting.
  • The Region conducts an S&OP meeting to finalize and communicate the plan.

The size of the business, the complexity of the network, replenishment lead times, etc., are used to determine whether the Global S&OP plan should be revised quarterly or monthly. Exceptions that arise during execution of the plan are resolved through the coordination of the Global Master Production Scheduler. Pre-established policies and procedures are used to control changes during the plan period and ensure focus is on total economics. The Global Master Production Scheduler routinely monitors performance to plan.

S&OP Process Flow

S&OP is a multi-step, collaborative process, with inputs from various stakeholders to develop an operational plan.

In this scenario, key inputs in development of the plan include:

  • Total Delivered Cost (Source-to-Customer)
  • Current Prices
  • Inventory Constraints
  • Production Capacities

Emphasis in measuring performance must be total profitability and the plan must result in higher utilization of assets and lower costs.

S&OP Scenario 2: Most Products Are Sold And Produced At A Regional Level

In the second scenario, the business offers many products in small quantities across a dispersed market. Some product-to-machine links must be maintained to ensure satisfied customers, and lead times do not allow for global sourcing. In this case, the Global Business Plan is allocated and maintained at a regional level.

The primary purpose of the Global S&OP process is again to ensure maximum profitability within service and inventory constraints. However, the supply plan is maintained at the regional level and no Global Master Scheduler exists. The aggregate S&OP Plan is reviewed by the Global S&OP team, which consists of marketing, supply chain, and finance personnel from each region as well as the global leader and members of their staff. (See Figure 3)

Global S&OP Process

In most organizations, regional teams develop forecasts and demand plans which are then reviewed by a centralized team.

In this scenario, the supply plan is not determined globally and allocated to the regions; rather, the supply plan is determined at the regional level and then aggregated for final review via the Global S&OP process. Balancing of service-cost-inventory occurs within the regional planning processes based on globally agreed-upon targets. In this approach, less emphasis is placed on cross-regional interaction and more on regional levels with the idea that the good regional performance will lead to good global performance.

Global S&OP Organization

To enable the global approach to planning, the organization must change, which requires vision and plan for change management. Responsibility for the process, the scorecard, and the technology become global. Regions participate in the selection of metrics, the design of the process, the development of the policies and procedures, etc. Also, both the demand planning and supply planning processes involve interaction between regional and global personnel. However, the ownership for the global processes is with the global personnel. The structure of the Global S&OP team is outlined in Figure 4.

 

Figure 4:  Global S&OP Team

Global S&OP organizational structure.

Global S&OP structure.

With a global approach, the firm can expect the number of persons involved in the S&OP meeting to increase. More and more emphasis will be placed on resolving most of the issues and doing most of the planning before the meeting. Only those issues and imbalances that were not resolved in the pre-S&OP meeting processes will be placed on the global meeting agenda.

Global S&OP Policies & Procedures

Given the complexity and number of stakeholders in such a global process, the business must develop and use policies and procedures to ensure overall goals are the focus, and make every effort to avoid disruptions due to differences in opinions. For example, rules are needed to control tradeoffs between production plans at regions. Policies are required for handling unplanned demands or production disruptions. Figure 5 describes key planning rules/policies to be established for a successful Global S&OP process.

Figure 5:  Key Planning Rules/Policies for a Successful Global S&OP Process

S&OP Global Policies

Global S&OP policies are required for all regional teams to follow the same procedures and best practices.

The Global S&OP team must periodically review and revise rules/policies and procedures as required. The team must reach consensus on the policies and procedures as all key stakeholders must support the planning outcome.

Keys to Successful Global S&OP

The primary difference in performance management is that metrics need to focus on global performance as appropriate, and must be cross-functional in nature. Some typical metrics used in Global S&OP include:

  • Total Operating Result, or Gross Margin vs. Plan
  • Total System Inventory vs. Plan
  • Actual vs. Planned Demand by Product Group
  • Actual vs. Planned Production by Product Group
  • Overall Forecast Accuracy

There are several challenges that are inherent when establishing a global planning process. These include:

  • Timely and accurate communications across regions and functions. To make certain this happens, adopt easy-to-use tools that can be accessed globally. Develop a meeting schedule on a rolling 12-month basis to ensure participation. Use a planning calendar and measure adherence to agreed-upon dates.
  • Align goals and objectives across regions and functions to ensure participants are not punished for shifting their focus on overall performance.
  • Design and implement global IT support with the goal of minimizing overall cost while providing key participants the data views and data aggregations they need.
  • Change management needs. This may require educating the Global S&OP participants in the process, and provide implementation and facilitation support for the first few months of the process.

At first, participants will not be focused on the global good. This takes time. The leadership will need to set the example. Clear roles and responsibilities must be developed, and documented procedures are needed to help remove emotion from the process. Performance against the business scorecard metrics will be the ultimate measure of success.

Benefits of Global S&OP

There are many benefits gained from implementing a Global S&OP process. Of course, with that, the firm improves overall financial performance. The typical benefits include:

  • Shift in focus on value added from local or regional to global.
  • Increased visibility across the entire supply chain enabling better business decisions and quicker reaction to issues.
  • Improved communications and teamwork across regions and functions leading to more balanced tradeoffs in decisions resulting in improved bottom line.

The regions and countries of a global firm will not optimize plans from a global perspective in the absence of a global process. Instead, they will maximize benefits to their region or country without regard for the overall business results. Leveraging S&OP by shifting the focus to the global bottom line will yield significant financial, customer, and internal benefits.

 

]]>
https://demand-planning.com/2019/06/01/what-is-sop-and-how-does-it-work/feed/ 6
How to Improve the Global S&OP Process: Hollister’s Journey https://demand-planning.com/2018/01/11/global-sop-process/ https://demand-planning.com/2018/01/11/global-sop-process/#respond Thu, 11 Jan 2018 13:57:45 +0000 https://demand-planning.com/?p=5852

Lewis Carroll once wrote, “If you don’t know where you are going, any road will get you there.” Watts H. Humphrey, the American software engineer countered with “If you don’t know where you are, a map won’t help.” These two quotes remind us about the two essential ingredients of a healthy, continuously evolving process: direction and decisiveness. For a successful global S&OP process, direction and decisiveness are crucial. 

We had recently remodeled demand planning process at Hollister and our destination was simple. It was to achieve the following:

  • Provide an interchange of thought between Sales, Marketing, Finance, and Operations
  • Create meaningful reporting for demand planners and end users
  • Focus on risk/opportunity for the company

Demand Planning and Global S&OP Process

Hollister Incorporated employs a global S&OP process divided into three geographical areas – North America, which I manage, is one of those areas. Each geographical area completes tasks on a similar schedule.

Demand Planning has the first six workdays of the monthly S&OP process to report KPIs, revise baseline and/or event forecasts, and review results with key internal partners. Demand Planning finalizes the demand plan, and hands it over to Supply Planning on day seven. Supply Planning creates a replenishment plan by the ninth workday. A pre-S&OP meeting by global region occurs on the tenth workday. The company demands a firm time schedule and fully engaged participants in order to deliver the report on day twelve to our executive S&OP meeting. The director of Global Operations, to whom the Demand Planning and Supply Planning teams report, presents key supply/demand imbalances and any required or volunteered action plans to our executives.

Also, the demand planning function at Hollister separates forecasts into two succinct categories – operational and budgetary forecasts. Operational forecasts consist of combining the revenue and sample forecasts. Revenue forecasts apply to products sold to customers. Sample forecasts apply to products provided to customers and sales representatives free of charge for demonstration and education. Budgetary forecasts consist of an annual plan and a modification of the annual plan during the middle of our fiscal year. My focus will be on the operational forecasting process.

Demand Plan Process: An Overview

The overall steps in the demand planning process remain the same: report KPIs, revise the demand plan, and review the revised plan with internal team members impacted by the changes. These steps occur during the first seven workdays of the month. I suspect this is a common practice in many companies.

For Hollister, I made some minor adjustments to KPI reporting. We still calculate forecast accuracy (error) using MAPE. However, now I include forecast accuracy tolerances by product segments meaningful to the end users including Marketing, Finance, and Sales. In the past, forecast accuracy was tracked to show improvement only. Now, not only do they show improvement but whether the accuracy for the current period is within acceptable parameters specific to a category of products.

As shown in Figure 1, the solid lines represent the upper and lower control limits. These are calculated with a varying range of standard deviations, depending on the business. Every point on the graph shows the forecast accuracy for that period, monthly in this case. The dashed line denotes the current trend.

Reports should be transparent, actionable, and tell the story. Transparency is simple. All Demand Planning reports are available for review by any team member either on a shared hard drive or via our intranet. The above report accomplishes the remaining two requirements. The report details the history of this particular business, the overall improvement not only in forecast accuracy but also in forecasting stability. Forecast accuracy has been improving from around 88% in August 2008 to 92% by June 2011. Not only has accuracy been improving, it also has been consistently getting better. The upper and lower control limits have narrowed to the range of 90% to 94%. This enabled the production team to rely more on forecasts than on their consumption data, to reduce their safety stock level, and to make improvements on their Just-in-Time standards. Also, the report demands action by the forecaster to continually improve results and to identify and repair causes of outliers like the one evidenced in February 2011 (see Figure 1).

Basic reporting is formatted similarly to the S&OP and financial reporting. The sample report later in this article displays this discipline. This maintains familiarity in reporting for the same audience, namely executive leadership. Reporting, including Demand Planning, adopts the corporate standard usually established by Finance.

Revising the demand plan requires considerable attention to avoid pitfalls and to build credibility. Four steps encompass the demand plan revision stage of Hollister’s demand planning process:

  • Cleansing and managing historical data
  • Maintaining a cyclical SKU-L review
  • Managing forecast exceptions
  • Reviewing event forecasts

A Good Cleansing

The first step in revising the demand plan is data cleansing. The “garbage in garbage out” theory in computer programming applies here as well. Forecast models, especially regression and exponential smoothing, exhibit sensitivity to outliers or unique events spanning over one or several periods. Neutralizing the outlier or event is the science part. Understanding what caused the outlier or whether the event is extremely important is the art part of demand planning. The demand planner can only adjust outlier(s) or system parameters if the cause is known and understood. For example, a plant explosion in the hometown of a major customer needed our wound care products for numerous burn victims. This was a one-time event because it does not happen every day. The entire purchase is removed from the data. In another example, initial orders by new customers are used not only to stock their shelves but also to cover their demand between order cycles and safety stock. Going forward, they will only replace what they sell. Based on our experience, we expect the future demand of such a customer be approximately 40% of the initial order. Therefore, we remove 60% of the initial demand data. Of course, timing of when sales will begin and when ramping up of demand will occur also requires some adjustments.

A Cyclical Approach

The second step is developing and maintaining a cyclical SKU review based on volume and variability. I like to think of my SKUs as children; I have 3,200 of them running around needing their own special attention—some more than others. Therefore, SKUs with high volumes and variability are reviewed monthly or semi-monthly (especially new product launches or focus products). Focus products often contain event forecasts. Medium volume products with high variability and vice versa are reviewed on a monthly basis. Products with lower volume and higher variability are reviewed less frequently; that is, quarterly. (See Figure 2)

Matrix of S&OP review process according to variability.

We use this model for reviews based on item variability.

Figure 2: Forecast Review Based on Volume and Variability

I determine each SKU’s coefficient of variability on an annual basis. The same is true for classifying a SKU’s volume. A-volume SKUs comprise 80% of the company volume. B-volume SKUs make up the next 15% of volume. And C-volume SKUs are the last 5%. However, I calculate a SKU as high, medium, or low volume within each marketing or sales manager’s area of responsibility. In some businesses, total unit volume does not equal the unit volume of one SKU in another business. Focus products qualify automatically for semi-monthly review.

Manage The Exceptions

The next to last step in the process is managing exceptions. This is accomplished using system alerts from APO-DP (SAP’s Advanced Planning Optimizer for Demand Planning) and reporting out of SAP’s Enterprise Data Warehouse (or Business Warehouse or Intelligence) application. Two classifications of alerts or reporting exist—responsive and reactive. Responsive alerts and reporting provides advance warning of what might happen with potential outliers and forecast accuracy challenges. Whereas, reactive alerts and reporting detail what happened. The goal of the process is to be 100% proactive and rarely, if ever, reactive. Time spent in reaction mode is time lost on learning the business and improving the process. Again, I cannot reiterate how important it is to understand what caused a miss in accuracy or an unforeseen outlier.

Review The Event

The last step in the process involves the event review meeting with Sales, Marketing, Finance, and Operations. The level of detail varies depending on how stable an event’s demand is and how knowledgeable the Sales and Marketing team is about the forecasting process. I will comment on this later. If variability is high, then we review at the SKU-Location level. If the event stabilizes, then we review at an appropriate aggregate level according to our company product hierarchy. Forecast accuracy and bias are calculated for each event as well. Again, the reporting must be actionable and tell a story.

Table 1: Accuracy of a New Product Launch
Product Line

J. Smith

January-11 February-11 March-11 April-11 May-11 June-11
New Product Launch 78.2% 69.6% 58.6% 53.5% 91.7% 98.6%

Table 1 reveals the story of forecast accuracy of a particular new product launch, which improved only after suffering some performance anxiety. This forecast required investigating why accuracy plummeted after the January 2011 launch. Two causes were identified. One, key customers did not readily adopt the new product similar to its predecessor. Two, customers were unsure how to properly use the new product. As you can see, Demand Planning in partnership with Sales and Manufacturing answered the challenge through forecast adjustments and enhanced customer training.

Monthly Demand Planning S&OP Meeting

The monthly demand planning meeting typically involves representatives from Sales, Marketing, Operations, and Finance. The purpose of the meeting is threefold: Identify supply constraint impacts on event forecasts and timing, close the gap between the demand and supply, and then approve the demand plan. Notice we identify supply constraints only. Hollister, Incorporated develops an unconstrained forecast.

The meeting agenda is divided into three parts: present causes behind any KPI out of tolerance limit, discuss key events with biggest impact on business, and then approve the demand plan. Not only are the causes of KPIs performing outside tolerances presented, but solutions developed or actions to be taken are presented as well.

Regarding the discussion of events, documented observations and any action taken are shared with Operations. This provides Operations (sometimes Finance) an opportunity to ask questions or to share any constraints with Sales and Marketing. Oftentimes, the constraint is known and already responded to.

Table 2 Demand Plan of Region A: 2011
Current Prev. Demand Plan AOP Mid-Year
Demand Plan June  2011 DP vs. Previous 2011 AOP DP vs. AOP 2011 Mid-Year DP vs. MY
Category A 1,597,000 1,592,400 0.3% 1,624,000 -1.7% 1,594,900 0.1%
Category B 2,555,800 2,533,600 0.9% 2,579,500 -0.9% 2,547,400 0.3%
Category C 1,060,500 1,063,100 -0.2% 1,089,500 -2.7% 1,055,500 0.5%
Category D 1,607,000 1,597,200 0.6% 1,643,200 -2.2% 1,592,900 0.9%
Category E 9,100 9,200 -1.1% 10,000 -9.0% 9,200 -1.1%
Total Product Line 1 6,829,400 6,795,500 0.5% 6,946,200 -1.7% 6,799,900 0.4%
Category F 6,400 5,900 8.5% 5,500 16.4% 6,000 6.7%
Category G 8,700 8,700 0.0% 9,000 -3.3% 8,600 1.2%
Category H 278,900 248,200 12.4% 272,800 2.2% 279,600 -0.3%
Total Product Line 2 294,000 262,800 11.9% 287,300 2.3% 294,200 -0.1%
Category I 100,800 100,900 -0.1% 92,300 9.2% 94,700 6.4%
Category J 384,000 389,200 -1.3% 346,700 10.8% 366,100 4.9%
Category K 4,900 4,900 0.0% 4,000 22.5% 4,500 8.9%
Category L 90,400 90,200 0.2% 72,500 24.7% 92,400 -2.2%
Category M 1,400 1,400 0.0% 1,200 16.7% 1,500 -6.7%
Total Product Line 3 581,500 586,600 -0.9% 516,700 12.5% 559,200 4.0%
Category N 113,000 113,000 0.0% 124,400 -9.2% 118,900 -5.0%
Category O 28,600 27,900 2.5% 25,800 10.9% 27,400 4.4%
Category P 29,300 30,500 -3.9% 38,600 -24.1% 31,800 -7.9%
Total Product Line 4 170,900 171,400 -0.3% 188,800 -9.5% 178,100 -4.0%
Total – Region A 7,875,800 7,816,300 0.8% 7,939,000 -0.8% 7,831,400 0.6%

The current demand plan is compared against the previous demand plan, the annual plan (AOP), and the mid-year adjustment. At times, it is necessary to share causes behind any larger-than-normal increases or decreases. For example, Category H, as shown in Table 2, would require explanation regarding an increase of 12.4% over the previous month’s demand plan. In this particular case, Sales won a new contract with a high volume customer.

What About The Rest Of The Month?

With regard to performing the above tasks, the balance of the month is spent monitoring performance (including going over the response-based alerts and reporting), managing forecasts on an as-needed basis (adding new product forecasts, adding or adjusting new events, or adjusting existing baseline), and mentoring internal customers on demand planning process and procedures. Every interaction offers the opportunity to reinforce basic principles, such as forecasts should reflect expected sales not a method of inventory management. As alluded to earlier, the training and understanding of internal partners is part of the process.

This article originally appeared in the Journal of Business Forecasting, Spring 2012 issue. To receive the Journal of Business Forecasting become an IBF member today. 

]]>